Although I wrote the title as a 5-ton mold, the weight does not matter. In terms of changeover time, there is almost no difference between a mold weighing 250 grams and a mold weighing 30 tons. What must be done is the same.
Let us now explain, in order, what must be done to reduce the changeover time. In many production plants, mold changeover time has become a problem. For the changeover of high-tonnage molds, machines stand idle for hours, throughout shifts, and even for days. (Did these times seem long to you? Look at your own plant and see how long you are stopped.)
Not changing the mold and running very long production runs may look like an easy alternative, but it is not recommended, because it leads to carrying inventories worth millions of lira.
The techniques that must be applied, in order, to move to quick mold changeover are SMED, 5S, and TPM. What must be done to bring the changeover time of a 5-ton mold down to 10 minutes
-
Make sure the mold is prepared in advance and is right beside the machine. For this, the 5S work must be done very well and the layout must be organized. If an injection process will be carried out, the mold will need to be heated. You can set up a heating system that imitates the machine on which the mold will be mounted, and you can preheat it.
-
Make sure that all tools and equipment to be used are prepared in advance and are at the machine.
-
In advance, connect all the sockets, water connections, and hydraulic connections that will be attached to the mold. Many people will now say that this is not possible. My advice to them is to think carefully. These things are possible.
-
Turn the system required to secure the mold to the machine (clamp, hydraulic, magnetic, or pneumatic) into a quick system.
-
Eliminate adjustments and make all parameters standard. Avoid the use of general parameters. Define parameter values specific to each product. For heat treatment, define seasonal values.
-
Afterward, disconnect all the sockets, water connections, and hydraulic connections of the mold that will be removed from the machine.
-
Apply TPM, and eliminate the failures of the machine and the mold in advance and definitively. Apply spare-parts planning.
-
You can reduce as much as 75% of the mold changeover time without any spending, simply by organizing the workflow and by applying 5S in the area.
Thinking that this article would receive various comments, I considered it appropriate to give an example. The changeover time of a washing-machine control-panel mold was brought down to 20 minutes solely by organizing the workflow. During the study it was found that each of the operators worked in a different sequence and that there was no standard. With the work that was done, every step was standardized and the time was successfully reduced.