Waste is work the customer does not pay for. Waiting, overproduction, stock, a defective part, unnecessary transport, unnecessary motion and extra processing are among these. It does not shrink while it stays unseen on the shop floor.
What does waste mean in lean production?
- Details
- Written by: Cevdet Dal
- Category: Lean production system help
- Hits: 10