Die changeover (setup) times on the production floor are an invisible area of loss for most businesses. The machine stops, operators rush about, and production waits. So what is the way to shorten this time radically? The most critical answer in the SMED (Single-Minute Exchange of Die) technique, and the one most often overlooked, is: Advance Preparation.

What Is SMED, and Why Advance Preparation?

SMED is a systematic lean production technique, developed at Toyota by the Japanese industrial engineer Shigeo Shingo, that aims to bring machine die and tool changeover times down to single-digit minutes (under 10 minutes). The successes Shingo achieved with this method delivered an average improvement of 94% in changeover times (for example, bringing 90 minutes down to under 5 minutes).

So what is the key to this striking improvement? At the root of Shingo's approach lies analyzing every step in the changeover process and making as many steps as possible doable "while the machine is running". This is where advance preparation comes in.

Advance Preparation: The Heart of Separating Internal and External Setup

There are two basic concepts in the SMED philosophy:

  • Internal Setup (Internal Elements): Operations that must be done while the machine has to be stopped (removing and fitting the die, adjustments, trial production).
  • External Setup (External Elements): Operations that can be done while the machine is running (bringing the new die, preparing the necessary tools, cooling, cleaning).

The first and most important step of SMED is to separate these two kinds of operation from each other by analyzing the current changeover process in detail. The real magic, however, happens at the second step: converting internal setup operations into external setup.

Advance preparation sits exactly at the center of this conversion and of external setup.

🏁 The NASCAR Track Example: The Power of Advance Preparation

One of the best examples for understanding SMED is NASCAR racing. It can take an ordinary driver 15 minutes to change a single tire. A NASCAR pit crew, however, changes four tires in less than 1.5 seconds. What is the secret of this extraordinary speed?

  • All the preparation (keeping the tires ready, positioning the equipment, coordinating the team) is done before the car stops.
  • At the moment of the pit stop, only the operations that "require the machine (the vehicle) to stop" are done (lifting with a jack, removing and fitting the lug nuts).
  • The process has been fully standardized and optimized.

This is a perfect reflection of external setup (advance preparation) and of parallel work in SMED.

Practical Steps for Improving Advance Preparation

So how can you strengthen advance preparation on your own shop floor? Here is the path to follow:

  1. Record the Current State on Video and Analyze It: Analyze the changeover process down to its smallest step. Classify each step as internal setup (while the machine is stopped) or external setup (while the machine is running).
  2. Identify the Steps That Can Be Converted: Find the operations done as internal setup that can also be done without stopping the machine. Examples are having the new die and all the necessary fixtures ready at the machine before you start removing the die, and completing the preheating operations.
  3. Create Standard Work Instructions (SOP): Standardize the advance-preparation steps and the external setup operations. Make clear which operation will be done by whom, when, and how.
  4. Support It with Visual Management and 5S: All the necessary tools, dies, and materials should be kept in a set order and easy to reach. This reduces preparation time considerably.
  5. Train and Empower the Teams: Explain the importance of advance preparation and of external setup to every operator. Encourage them to generate Kaizen ideas.

The Gains from Advance Preparation: Change in Numbers

A strong advance-preparation process directly affects the success of SMED applications. In one study, preparation times for an injection molding machine in a firm were reduced from 65.30 minutes to 23.62 minutes with SMED and 5S applications. This is only a beginning; the target is always under 10 minutes.

The benefits SMED provides are not limited to this:

  • Lower Production Cost: Less machine downtime, less lost time.
  • Small-Batch Production and Flexibility: Fast changeovers make it possible to produce in smaller batches and to respond more quickly to customer demand.
  • Lower Inventory Levels: Small batches mean less intermediate and finished-goods inventory.
  • More Consistent Quality: Standardized changeover processes reduce the error rate and raise first-pass quality.

❓ Frequently Asked Questions about SMED

📌 In which sectors can SMED be applied?

SMED can be applied in every production sector that requires a die or tool change, above all in automotive, home appliances, electronics, plastic injection molding, metal forming, and pharmaceuticals.

⏱️ How long does a SMED application take?

The duration of the application depends on the current setup time and on the team's participation. Typically, a SMED study starts with a workshop of 1-2 days, and then trials and improvements continue within 2-3 weeks. With continuous improvement, setup times are reduced for good.

🔧 What equipment or technology does SMED require?

SMED is first of all a change of mindset. Expensive automation or new machines are not required. Low-cost improvements such as quick-connect fixtures, visual labeling, standard tool sets, and simple transport equipment, however, make a large difference.

👥 Who should take part in a SMED study?

Operators, maintenance technicians, process engineers, and quality specialists should be included in the study. Participants taking an active role on the shop floor increases the permanence of the solutions.